Skip to content

Build scope, pricing and inclusions

Schedule ID: PS-BUILD-2026-11-15-v1 · Version 1 · 15 November 2026

This schedule applies only when incorporated into an accepted order.

Fixed build quotes are valid for 30 days; the order records the validity start and expiry. The order records counts, tier, adders, price, milestone events, acceptance and go-live. Typical durations are estimates; the fixed quote states the actual timeline. The support window starts at go-live. Calendar, business-day holidays and time zone must be recorded in the order.

The tiers at a glance

1. Placement criteria (bands don't overlap)

Zero-AI builds (plain integrations and rule-based automations) count 0 AI steps, which sits in the S band, so the other three criteria place them. They get the same price as an AI build of the same size, because the time goes into systems and edge cases instead.

"Top of M" means a criterion sits at M's maximum: 3 workflows, 4 system units, 3 AI steps (or 1 tool-using agent) or 10 edge cases.

2. How a quote is built (always in this order)

  1. Count the 4 criteria. A system without an API is counted as 2 units here, and only here.
  2. Place: the tier is the highest band any one criterion reaches.
  3. Bump: if the result is M and 2 or more criteria are at the top of M, the project becomes L. The client can choose phases instead, and each phase is then placed again from step 1.
  4. Price: S and M are flat. L is $18,000 plus scale-ups (below).
  5. Adders: add only the items in section 3. They never change the tier, and nothing that step 1 counts is charged here.

L base covers up to 5 workflows, 6 system units, 5 AI steps and 20 edge cases. L scale-ups: +$3,000 per extra workflow, +$1,500 per extra system unit, +$1,500 per extra AI step, +$1,000 per started block of 5 extra edge cases (round up: 1–5 extra = $1,000, 6–10 extra = $2,000; no prorating).

3. Adders (things the criteria do not count; quoted)

Not included: AI and infra running costs (the client pays these on their own accounts, and the audit estimates them), and licences.

4. Worked examples (each one gets one tier and one price)

5. What every tier includes